Advertisement

CR announces Infrastructure Maintenance work at Mumbai's Mazgaon Yard

Moreover, the CR has urged the passengers to follow COVID-19 appropriate behaviour while boarding and alighting at stations and travelling in train.

CR announces Infrastructure Maintenance work at Mumbai's Mazgaon Yard
SHARES

The Central Railways (CR) will operate an infrastructure maintenance block for washing pit repairs and maintenance at Mazgaon Yard.

Due to this block, the following trains will run with one second class seating coach reduced in their composition as under starting today, January 10, 2022.

22107 Mumbai-Latur Express from 10.1.2022 to 24.2.2022

22108 Latur-Mumbai Express from 11.1.2022 to 25.2.2022

22143 Mumbai-Bidar Express from 12.1.2022 to 23.2.2022

22144 Bidar-Mumbai Express from 13.1.2022 to 24.2.2022

11003/11004 Dadar-Sawantwadi Road-Dadar Tutari Express from 10.1.2022 to 24.2.2022

Passengers are requested to kindly note this change due to the infrastructure maintenance block.

Moreover, the CR has urged the passengers to follow COVID-19 appropriate behaviour while boarding and alighting at stations and travelling in train.

Meanwhile, the Central Railways (CR) commissioned a state of the art, Electronic Interlocking (EI) system at Sewri railway station from December 26, 2021. This Electronic Interlocking can handle 26 track circuits and is built with fire alarm, fuse alarm and earthing detector system.

Also Read: Here's How Central Railways Earned Over Rs 350 crore

RELATED TOPICS
Advertisement
MumbaiLive would like to send you latest news updates