Chief Minister Devendra Fadnavis inspected closely the construction work of Metro-3 from Seepz to Colaba. Metro 3 is a 33.5 km long underground corridor running along
Live update:
— CMO Maharashtra (@CMOMaharashtra) https://twitter.com/CMOMaharashtra/status/859101668524339201">May 1, 2017
CM https://twitter.com/Dev_Fadnavis">@Dev_Fadnavis is on a visit to inspect the work of entire route of Metro 3 from SEEPZ to Colaba with senior MMRDA officials. https://t.co/R8FzIJZ6AS">pic.twitter.com/R8FzIJZ6AS
CM Fadnavis embarked his visit at 11.45 pm from Azad Maidan. Fadnavis visited the entire stretch till Seepz in Andheri.