Central Railway (CR) will operate 3 Special Traffic and Power block for dismantling of two portals of structures and load transfer at Karjat Station in connection with Karjat yard modification on 21.04.2023, 25.04.2023 and 28.04.2023 from 10.45 am to 12.00 Noon.
Running pattern of suburban trains:
SKP-5 and SKP-10 Khopoli-Karjat locals will remain cancelled.
Regulation of Following Mail/Express trains: -
1.Train No 22731 Hyderabad-Mumbai Superfast Express will be regulated at Lonavala from 10.32 hrs to 11.25 hrs and will arrive destination 65 minutes behind schedule.
2. Train No 11014 Coimbatore-LTT Express will arrive destination 15-20 minutes behind schedule
Passengers are requested to bear with the Railway Administration for the inconvenience caused due to this infrastructure block.