Advertisement

Mumbai Local News: 36 hours Infrastructure Block On Thane-Kalva Slow Lines

The block will be operated on Up and Dn slow lines from 02.00 pm on Saturday, January 8 to 02.00 am on Monday 10.

Mumbai Local News: 36 hours Infrastructure Block On Thane-Kalva Slow Lines
SHARES

Central Railways will operate 36 hours infrastructure block on Up and Dn slow lines between Thane and Kalwa stations for carrying out cut and connection of newly laid track and commissioning of crossovers in connection with Thane-Diva 5th and 6th lines The block will be operated on Up and Dn slow lines from 02.00 pm on Saturday, January 8 to 02.00 am on Monday 10.

During this block, the newly laid track between Thane and Vitava Road under Bridge will be cut and connected to the existing Dn and Up slow lines. Similarly, insertion and commissioning of crossovers, turnouts, derailing switches in connection with yard remodelling and alteration in Interlocking arrangements at Thana and Kalva will be carried out during the Block period. 7 tower wagons, 3 Unimat/Duomatic machines, 2 Diesel multi locos, one ballast rake, 1 DBKM etc will be used for carrying out engineering, electrical and signal and telecommunication works.

Due to this train running pattern will be as under:

  • Up slow/semi-fast services leaving Kalyan from 1.00 pm on January 8will be diverted on Up fast line between Kalyan and Matunga till 2.00 pm skipping halt at Thakurli, Kopar, Mumbra, Kalva, Nahur, Kanjurmarg and Vidyavihar stations further diverted on Up slow line.
  • After 2.00 pm Up slow/semi-fast services will be diverted on Up fast line between Kalyan and Mulund skipping halt at Thakurli, Kopar, Mumbra and Kalva stations and will arrive destination 10 minutes behind schedule.
  • Dn slow/semi-fast services leaving Dadar from 12.54 pm on January 8 to 1.52 pm will be diverted on Dn fast line between Mulund and Kalyan stations skipping halt at Vidyavihar, Kanjurmarg, Nahur, Kalva, Mumbra, Kopar and Thakurli stations.
  • After 2.00 pm, Up slow/semi, fast services will be diverted on Up fast line between Mulund and Kalyan stations skipping halt at Kalva, Mumbra, Kopar and Thakurli stations and will arrive destination 10 minutes behind schedule.
  • Suburban services will not be available at Kalva, Mumbra, Kopar and Thakurli stations during the block period.
  • Passengers boarding from Kalva, Mumbra, Kopar and Thakurli stations are advised to board trains from Thane, Diva, Dombivali and Kalyan respectively.
  • Railway Administration has arranged to run buses in coordination with Municipal Authorities for the benefit of passengers.
  • Dombivali Originating / terminating locals will not be available during the entire block period.

During the block period, slow line locals will halt on fast line platforms at Thane, Dombivali and Diva.

Suburban Services will run as per schedule on Monday, January 10.

Cancellation of Express trains Journey Commencing on Friday, January 7 and Saturday, January 8.

  • 12112 Amravati-Mumbai Express
  • 12140Nagpur-Mumbai Sevagram Express
  • 17611 Nanded – Mumbai Rajyrani Express

Cancellation of Express trains Journey Commencing on Saturday, January 8 and Sunday, January 9

  • 11007 / 11008 Mumbai-Pune-Mumbai Deccan Express
  • 12071 / 12072 Mumbai-Jalna-Mumbai Janshatabdi Express
  • 12109 /12110 Mumbai-Manmad-Mumbai Panchvati Express
  • 11401 Mumbai-Adilabad Nandigram Express
  • 12123 /12124 Mumbai-Pune-Mumbai Deccan Queen
  • 12111 Mumbai-Amravati Express
  • 12139 Mumbai – Nagpur Sewagram Express
  • 11139 Mumbai-Gadag Express
  • 17612 Mumbai-Nanded Rajyarani Express

Cancellation of Express trains Journey Commencing on Sunday, January 9 and Monday, January 10

  • 11402 Adilabad-Mumbai Nandigram Express
  • 11140 Gadag-Mumbai Express

Short termination of Express trains at Pune

  • 17317 Hubballi-Dadar Express JCO January 7 and 8
  • 11030 Kolhapur–Mumbai Koyna Express JCO January 8and 9

Short Origination of Express trains from Pune

  • 11029 Mumbai – Kolhapur Koyna Express JCO January 9 and 10
  • 17318 Dadar- Hubballi Express JCO January 8 and 9

Also Read: Mumbai: 134 EV Charging Points To Soon Come Across City

Read this story in मराठी
RELATED TOPICS
Advertisement
MumbaiLive would like to send you latest news updates