Advertisement

Traffic to Be Halted on Western Express Highway Between April 3 and April 4


Traffic to Be Halted on Western Express Highway Between April 3 and April 4
SHARES

The construction of a foot overbridge near Magathane Metro station, Borivali (East), will be undertaken on April 3. With this in mind, both sides of the Western Express Highway (WEH) will be shut for traffic between 11 PM on April 3 and 6 AM on April 4 as per traffic officials. 

Traffic officials have recommended heavy vehicles heading towards Vasai-Virar from Mumbai to take a right turn at JVLR junction, continue on the road towards Powai/Vikhroli, take a turn at Eastern Express Highway, move towards Thane, and finally use the Ghodbunder road to reach Vasai-Virar. 

Also read - Western Express Highway Could See Reduced Traffic Thanks To Three Underpasses And A Wider Flyover

Here are the directions recommended by the traffic police for light vehicles heading towards Vasai-Virar:

  • Take a left turn on the Kandivali Slip Road near Akurli subway 
  • Head towards the Kandivali Railway Station
  • Left turn at Thakur House
  • Take the Rajguru flyover and reach SV Road 
  • Head towards the Poisar depot
  • Right turn at Sumer Nagar Junction
  • Left turn at WEH

ReadMaharashtra Govt To Broaden Thane Railway Station Soon: Eknath Shinde

Meanwhile, heavy vehicles coming from Vasai-Virar to Mumbai will have to turn left at Fountain Hotel, continue on Ghodbunder road, take the Eastern Express Highway, and finally move through the Anand Nagar checkpoint.

Light vehicles travelling in this direction are required to turn left near Pawaskar flyover, take a right at Wireless compound, continue on Link Road, turn left at Mith Chowky junction, continue on SV Road towards Malad subway, and reach the Western Express Highway. 

Also readMumbai Traffic Police Seizes 24 Stolen Vehicles With Suspicious Number Plates

Read this story in मराठी
RELATED TOPICS
Advertisement
MumbaiLive would like to send you latest news updates