Central Railway (CR) and Western Railway (WR) to carry 6-hours mega block and jumbo block respectively on February 4, 2018.
Post Elphinstone-stampede, army soldiers took the responsibility of building the new foot-over-bridge for which the mega block will be carried out from 8:30 am to next eight hours between CSTM and Dadar. During this block, power will be cut-off for placing the girders.
On WR, the jumbo block will be carried out between Goregaon to Andheri on both up and down fast line from 10:00 am to 4:00 pm and 10:00 am to 2:00 pm respectively. During the block, all fast line services will be diverted to the slow line.
The last CSTM-bound fast local will leave Dadar at 8:12 am and last CSTM-bound slow local will run leave Dadar at 9:00 am. Likewise, Dadar-bound slow local will leave CSTM at 9:05 am and last slow Dadar-bound local will leave at 9:12 am.